Manufacturing and quality control
How SUPERGENIE links product requirements, incoming controls, assembly, testing and release records for B2B charging programs.

Quality evidence should be tied to the exact product, configuration, batch and agreed inspection scope.
Request support →A defined scope technical and sourcing teams can use.
Approved specifications
How SUPERGENIE links product requirements, incoming controls, assembly, testing and release records for B2B charging programs.
Incoming and process checks
How SUPERGENIE links product requirements, incoming controls, assembly, testing and release records for B2B charging programs.
End-of-line test scope
How SUPERGENIE links product requirements, incoming controls, assembly, testing and release records for B2B charging programs.
Batch traceability records
How SUPERGENIE links product requirements, incoming controls, assembly, testing and release records for B2B charging programs.
Four gates keep commercial speed aligned with engineering control.
- 01
Approve
Freeze drawings, materials and inspection requirements.
- 02
Control
Check incoming parts and defined process points.
- 03
Test
Run configuration-appropriate electrical and functional checks.
- 04
Trace
Retain agreed production and release information.
