Skip to content
OEM / ODM EV connection systemsEngineering reply within 1 business day
English
EnglishEN中文ZHDeutschDEFrançaisFREspañolESBahasa IndonesiaIDالعربيةAR
Start an RFQ
Menu
Company capability

Manufacturing and quality control

How SUPERGENIE links product requirements, incoming controls, assembly, testing and release records for B2B charging programs.

04Working pathProgram output
Manufacturing and quality control at SUPERGENIE
Core buyer challenge

Quality evidence should be tied to the exact product, configuration, batch and agreed inspection scope.

Request support
Program output

A defined scope technical and sourcing teams can use.

01

Approved specifications

How SUPERGENIE links product requirements, incoming controls, assembly, testing and release records for B2B charging programs.

02

Incoming and process checks

How SUPERGENIE links product requirements, incoming controls, assembly, testing and release records for B2B charging programs.

03

End-of-line test scope

How SUPERGENIE links product requirements, incoming controls, assembly, testing and release records for B2B charging programs.

04

Batch traceability records

How SUPERGENIE links product requirements, incoming controls, assembly, testing and release records for B2B charging programs.

Working path

Four gates keep commercial speed aligned with engineering control.

  1. 01

    Approve

    Freeze drawings, materials and inspection requirements.

  2. 02

    Control

    Check incoming parts and defined process points.

  3. 03

    Test

    Run configuration-appropriate electrical and functional checks.

  4. 04

    Trace

    Retain agreed production and release information.