Skip to content
OEM / ODM EV connection systemsEngineering reply within 1 business day
English
EnglishEN中文ZHDeutschDEFrançaisFREspañolESBahasa IndonesiaIDالعربيةAR
Start an RFQ
Menu
For charger manufacturers

EVSE OEM Programs

Move from interface selection to validated cable assemblies with one engineering conversation.

Discuss your program
Program output

A defined scope your technical and sourcing teams can use.

01

Configuration matrix

Captured against the selected connector, market and production configuration.

02

Drawing and sample control

Captured against the selected connector, market and production configuration.

03

Validation evidence plan

Captured against the selected connector, market and production configuration.

04

Forecast-based supply model

Captured against the selected connector, market and production configuration.

Working path

Four gates keep commercial speed aligned with engineering control.

  1. 01

    Share the use case

    Tell us the interface, power level, market, annual volume and target schedule.

  2. 02

    Lock the configuration

    Engineering aligns electrical, mechanical, cable, sensor and branding choices.

  3. 03

    Validate the sample

    Confirm drawings, samples and the evidence plan before production release.

  4. 04

    Control the supply

    Use approved specifications, batch traceability and forecast-led replenishment.