For CPO hardware teams
Public Charging Networks
Align connector selection with power, utilization, environment and field-maintenance targets.
Discuss your program ↗Program output
A defined scope your technical and sourcing teams can use.
01
Environmental configuration
Captured against the selected connector, market and production configuration.
02
Thermal risk review
Captured against the selected connector, market and production configuration.
03
Holster compatibility
Captured against the selected connector, market and production configuration.
04
Service documentation
Captured against the selected connector, market and production configuration.
Working path
Four gates keep commercial speed aligned with engineering control.
- 01
Share the use case
Tell us the interface, power level, market, annual volume and target schedule.
- 02
Lock the configuration
Engineering aligns electrical, mechanical, cable, sensor and branding choices.
- 03
Validate the sample
Confirm drawings, samples and the evidence plan before production release.
- 04
Control the supply
Use approved specifications, batch traceability and forecast-led replenishment.
